Technical safety and work environment analyses at Aker BPs Alvheim
Kaefer Energy (KE) had the mission of doing modification work in context with a new kitchen/galley at Aker BPs Alvheim. The solution was made in cooporation between Aker BP and Norema. Petrell had a central role regarding technical safety and work environment during the study and implementation phase of the galley in Des 18/Jan 19. The aim was to make sure that the solution satisfied the requirements of NORSOK S-001 and S-002. Petrell did
Develop HSE and work environment program (with focus on installation)
Execute workshop regarding analyzing the work environment
Give input when the WEAC was updated
Participate on the design evaluation
Leade HAZID for the installation work
Mark-up of plot plans
IDC
General project support regarding technical safety and work environment