Petrell has previously (early 2018) carried out analyzes of the Knarr process system by optimizing passive fire protection and performing …
A fire integrity analysis of selected vessels and connected equipment and pipework has been performed for the Queensland Curtis LNG …
Over the last couple of years, we have developed a scheme for analysis of fire integrity of flanges. The development …
In order to address safety issues and flow assurance in CO2 rich processes, modelling and prediction of the formation of …
Teekay Petrojarl Production is executing modifications of the FPSO Petrojarl 1 for deployment at the Atlanta field offshore Brasil. The …
A detailed low temperature study is performed on two segments on the Gassco Emden project using VessFire 2.0. Both pressurisation and …
The objective of the smoke study was to investigate the effect of fire on the behaviour of the ventilation system …
We have completed a piping fire integrity analysis for the Rimfaksdalen inlet arrangement on Gullfaks for Wood Group Mustang Norway …