Selected Project Resumes

Projects 2013-2016

Year Installation Description Geo Area
2016  Platform  Analysis of Blowdown and Formation of Solid CO2  Malaysia
2015  Platform  Fire Integrity Analysis of Flanges  Norway
2015  Onshore Facility  Survivability Study  US
2015  Other  Sensitivity analysis of flanges  Norway
2015  FPSO  Depressurisation Study  Netherlands/Brazil
2015  Platform  Fire Integrity Analysis of Flanges  Norway
2015  Platform  Fire Integrity Analysis  Norway
2015  Platform  Study of Flanges  Norway
2015  Other  Testing of Steel Pipes  Norway
2015  Platform  Gas Dispersion Study  Norway
2014 Onshore Facility  Vessel Survivability Analysis  Australia
2014  Platform  Fire Integrity Analysis  Norway
2014  Platform  Flange Analysis  Norway
2014  Other  Strength Analysis of Flanges  Norway
2014 Onshore Facility  Low Temperature Analysis of Slam Shut Valves  Germany
2014  Platform  Smoke Study  Norway
2014 Onshore Facility  Detailed Temperature Profile Study  Germany
2014  Platform  Flange Analysis  Norway
2014  Platform  Fire Wall Analysis  Norway
2014 Onshore Facility  Analysis of Spherical Vessels and Flare System  Norway
2014  Platform  HAZID  Norway
2014  Platform Flange Analysis  Norway
2014  FPSO Flange Analysis  Norway
2014  Platform HAZID  Norway
2013  Platform PFP Calculations  Norway
2013  Platform Cold Temperature Analysis  Norway
2013  FPSO Fire Integrity Analysis of Flanges  Norway
2013  FPSO Fire Integrity Analysis  Norway
2013  Platform FEED Verification  Norway
2013 Onshore Facility VessFire Analysis  Norway

References - Technical Safety

Petrell has been involved in the following projects as discipline lead or discipline engineer:

B – Feasibility study
C – Concept Study
D – Detail Engineering
FEED  – Front End Engineering Design

  • Tambar (execution)
  • Statfjord Late Life ESP (C, D)
  • Tyrihans (execution) (ÅGB scope)
  • Åsgard Min Flow (C, D studies)
  • Heidrun PPL (C, D and execution)
  • Kristin LPP (C, D)
  • Halten power from shore (B, C)
  • Oselvar – Ula modifications (C, D)
  • Norne M tie-in to Norne (C, D)
  • Gullfaks cement unit (execution)
  • Alve tie-in to Norne (C)
  • Sleipner IO facilities (C/D)
  • Njord IO facilities (C)
  • Sleipner increased exp press (C)
  • Marulk tie-in to Norne (C, D)
  • GF SPM upgrade (C)
  • Snorre A IO facilities (C)
  • Draugen (FEED)
  • Njord LPP (D)
  • Gygrid (D)
  • Kristin M&M (C, D, execution)
  • New lifeboats Grane (B,C)
  • Heidrun EOR (B)
  • Skuld (C, D, execution)
  • Troll B upgrade galley etc (D)
  • Troll B new life boats (C, D)