Fire Integrity Analysis QCLNG Project

A fire integrity analysis of selected vessels and connected equipment and pipework has been performed for the Queensland Curtis LNG Project. Results were evaluated with respect to acceptance criteria specified by the Client. VessFire was used for modelling and simulations.